跳到内容

快速参考指南

本快速参考指南旨在协助救援人员应对高压救援现场,重点介绍了 Res-Q-Jack 系统的关键稳定和顶升应用。该指南提供了简明扼要且侧重实操的信息,帮助救援队伍针对各种车辆救援场景快速确定有效的部署方案。

重要安全信息

本信息仅供参考。根据车辆状况和类型、地形、电气隐患、部门规程及其他现场变量,可能需要额外的设备、预防措施和/或操作技巧。为确保所有车辆救援工具(包括 Res Q Jack® 救援支撑杆)的安全操作,必须穿戴全套个人防护装备,并充分了解车辆和设备的额定工作载荷。

本网页所载的所有内容、培训信息及技术均为 Res Q Jack, Inc. 的专有财产,未经 Res Q Jack, Inc. 事先书面同意,不得复制、分发或发布。

Row rect Shape Decorative svg added to top

(A) 轮子侧面支撑式提升

所需设备:

A. Apex Strut SMALL

(1)

Res-Q-Jack 支撑杆

 

A. Apex Jack SMALL

(1)

Res-Q-Jack 顶撑

 

A. Chain & Hook Assembly SMALL

(1)

链条与挂钩组件

额定载荷:4,700 磅(2,132 公斤)

A. Ratchets with Wire Hooks SMALL

(3)

钢丝钩棘轮带

额定载荷:3,300 磅(1,497 公斤)

A. Clusters SMALL

(4)

集群

额定载荷:4,700 磅(2,132 公斤)

A. Wheel Chocks SMALL

(2)

棘轮式车轮止滑块

 

+ 任何必要的垫木、楔块、木桩、系绳等

Row rect Shape Decorative svg added to top

初始设置

1
2
Row rect Shape Decorative svg added to top

说明

  • 在车辆两侧下方放置垫块
  • 如需增加车轮下方的离地间隙,可将悬挂系统固定
  • 在车辆与举升机相对的一侧,用轮挡固定前后车轮
  • 将支撑杆放置在“A”柱和“B”柱之间,倾斜角度为40˚至70˚,并确保支撑杆与车门外板之间至少留有4英寸的间隙
  • 将端部接头卡入车顶导轨
  • 将链条和挂钩组件上的大号J型挂钩挂在车顶导轨上,位置靠近支柱顶端。将链条沿车顶横向拉至车辆另一侧
  • 将棘轮带的一端扣在链条末端
  • 将绑带向下穿过车底,绕到另一侧
  • 将带子挂在支柱底部
  • 拧紧棘轮带,直到固定牢固
  • 要抬起车辆,请操作千斤顶。在车辆升起过程中,请不断调整垫木,以保持其与车辆的接触。

已完成提升

3
Row rect Shape Decorative svg added to top

(B) 轮子支撑式后部升降装置

所需设备:

B. Apex Struts SMALL

(2)

Res-Q-Jack 支架

 

B. Apex Jacks SMALL

(2)

Res-Q-Jack 千斤顶

 

B. Ratchets with Wire Hooks SMALL

(2)

钢丝钩棘轮带

额定载荷:3,300 磅(1,497 公斤)

B. Clusters SMALL

(2)

集群

额定载荷:4,700 磅(2,132 公斤)

B. Wheel Chocks SMALL

(2)

棘轮式车轮止滑块

 

+ 任何必要的垫木、楔块、木桩、系绳等

Row rect Shape Decorative svg added to top

初始设置

1
2
Row rect Shape Decorative svg added to top

说明

  • 在车辆两侧下方放置垫块
  • 如需增加车轮下方的离地间隙,可将悬挂系统固定
  • 在前轮前后各放置挡块,防止车辆前后移动
  • 在车辆两侧靠近后车顶立柱处放置两根支撑杆,倾斜角度为 40˚ – 70˚,并确保支撑杆与车门外板之间至少留有 4 英寸的间隙。将支撑杆末端的连接件与车顶导轨扣合
  • 用棘轮带将两根支撑杆的底座连接起来。拧紧绑带
  • 将防摆带从支撑架底座松散地连接至车辆底盘,形成三角形。确保棘轮扣环缠绕多圈,且棘轮处于锁定位置
  • 提升时,同时操作两个千斤顶。为控制摆动,根据需要收紧连接至底盘的防摆带。随着车辆升高,持续调整垫块以保持与车辆的接触

注意:若患者妨碍底座间绑带的使用,请在每根支撑杆的底座处固定

已完成提升

3
Row rect Shape Decorative svg added to top

(C) SIDE-RESTING FRONT LIFT

所需设备:

C. Apex Struts SMALL

(2)

Res-Q-Jack 支架

 

C. Apex Jacks SMALL

(2)

Res-Q-Jack 千斤顶

 

C. Ratchet with Wire Hook SMALL

(1)

钢丝钩棘轮带

额定载荷:3,300 磅(1,497 公斤)

A. Chain & Hook Assembly SMALL

(1)

链条与挂钩组件

额定载荷:4,700 磅(2,132 公斤)

C. Chain SMALL

(1)

16 英尺(4.9 米)链条

额定载荷:4,700 磅(2,132 公斤)

C. Clusters SMALL

(3)

集群

额定载荷:4,700 磅(2,132 公斤)

+ 任何必要的垫木、楔块、木桩、系绳等

Row rect Shape Decorative svg added to top

初始设置

1
2
Row rect Shape Decorative svg added to top

说明

  • Crib both sides of the vehicle to increase ground contact. Use a minimum of 4 wedges: 2 on the front and 2 on the back
  • Place the strut at the ‘A’ post in the corner of the windshield on the high side of the vehicle
  • Connect the J-hook from the Chain and Hook Assembly to the lower ‘A’ post, to create a base restraint
  • Place the second strut at the underside of the vehicle, opposite the first strut at the front of the car
  • Engage the strut head with the frame of the vehicle or other structurally sound area
  • Connect a chain to the undercarriage or wrap chain around the front wheel assembly. Keep the connection point as low as possible
  • Pull the chain to the rear wheel assembly, remove slack and reconnect the chain using a cluster
  • To lift, operate both jacks at the same time. As the vehicle is raised, continually adjust cribbing to maintain contact with the vehicle

Note: This lift is intended for a maximum of 6-8” of clearance beneath front wheel

已完成提升

3
Row rect Shape Decorative svg added to top

(D) ROOF-RESTING REAR LIFT

所需设备:

C. Apex Struts SMALL

(2)

Res-Q-Jack 支架

 

C. Apex Jacks SMALL

(2)

Res-Q-Jack 千斤顶

 

D. Pickets SMALL

(2)

路障

 

D. Ratchet with Wire Hook SMALL

钢丝钩棘轮带

额定载荷:3,300 磅(1,497 公斤)

D. Ratchet with Snap Hook SMALL

(1)

快扣棘轮带

额定载荷:2,000 磅(907 公斤)

C. Chain SMALL

(1)

16 英尺(4.9 米)链条

额定载荷:4,700 磅(2,132 公斤)

D. Clusters SMALL

(2)

集群

额定载荷:4,700 磅(2,132 公斤)

+ 任何必要的垫木、楔块、木桩、系绳等

Row rect Shape Decorative svg added to top

初始设置

1
2
Row rect Shape Decorative svg added to top

说明

  • Crib the vehicle and use tie lines as necessary to control all possible movement
  • If on soft ground. use a picket at each front corner to secure the vehicle
  • Wrap the chain around the vehicle near the rear of the trunk, removing slack and hooking the chain to itself at the high side of the vehicle
  • To remove additional slack. slide the chain forward
    so the final position of the chain is tightly secure. centered between the wheel well and the rear of
    the trunk
  • Place a strut on each side of the vehicle at the rear fender
  • Engage the end fittings with the chain wrap near the middle of the rear fender. as shown
  • Connect the bases of the struts to each other with a ratchet strap: tighten to remove slack in chain
  • Secure the chain from sliding off the vehicle by connecting the snap hook from a ratchet strap into a link of chain, just below the strut engagement
  • Run the strap around the rear wheel. Use cribbing to protect the strap from sharp objects or hot exhaust
  • Connect the strap to the chain around the opposite wheel
  • To lift, operate both jacks at the same time. To control sway, tighten the secondary straps as needed. As the vehicle is raised, continually adjust cribbing to maintain contact with the vehicle

已完成提升

3

今天就安排您的免费演示!

正在考虑购买我们易于使用的车辆稳定和提升支杆? 在你承诺购买之前想要一个演示吗?

滚动到顶部